How to reduce waste during a building project
Whether you are extending a Victorian terrace, converting a loft or knocking two rooms into one, the waste produced during building work is one of the easiest costs to overlook. Skips are ordered, materials are over-bought, and offcuts disappear into a mixed pile heading for landfill. A little planning before the first brick is lifted can cut that waste dramatically and shave a surprising amount off your budget. Better still, much of what you save can be reused or sold on, so it is worth thinking about waste as a resource rather than a nuisance.
Start with a detailed materials schedule
Most waste on domestic projects is created at the buying stage, not the building stage. Ordering "a bit extra just in case" is understandable, but it is also how half-used bags of plaster and pallets of bricks end up in a skip. Before work begins, ask your builder or designer for a proper materials schedule: what is needed, in what quantity, and when.
- Measure twice and calculate in square metres or linear metres, then add a realistic wastage allowance of 5–10 per cent, not 25.
- Order in stages for larger jobs. Brick, timber and plasterboard for the first phase only, with the rest ordered once quantities are proven.
- Confirm the returns policy before ordering. Many merchants accept unopened, undamaged extras within 28 days, which turns over-ordering from a loss into a recoverable cost.
- Standardise where you can. Using the same block size or timber section throughout means offcuts from one task can be used in the next.
It also helps to know precisely what you are working with. A quick measured survey of existing walls, floor levels and openings will tell you whether a nominal 100mm timber stud is genuinely 100mm, or whether your joists are an odd historic size worth keeping.
Reuse what is already in the building
Older British houses are full of materials that are better than anything you can buy new. Reclaimed bricks, slate, floorboards and stone flags have a character that is almost impossible to replicate, and keeping them on site saves both purchase and disposal costs.
- Lift floorboards carefully with a bolster rather than a crowbar, and store them flat and dry for reuse on the same floor or as shelving.
- Clean and stack reclaimed bricks on a pallet. Even if you do not use them all, they hold real resale value.
- Keep slate, tiles and stone for patching roofs, paths or garden walls rather than crushing them into a skip.
- Retain internal doors, architraves and skirting where they suit your design. Stripping paint is often cheaper than buying new joinery of similar quality.
- Crush clean brick and concrete rubble for hardcore under a new path or patio, subject to your builder confirming it is suitable.
One caveat: do not reuse structural timber, lintels or anything that has been load-bearing without a structural engineer's approval. Reuse is a judgement call, not a blanket rule.
Separate waste properly on site
A single mixed skip is convenient but wasteful. Once everything is tipped together, nothing can be recovered. Setting up two or three clearly labelled bays, even if they are just marked-out areas on the driveway, lets you sort as you go.
- Hardcore and masonry: bricks, blocks, tiles, concrete and stone.
- Timber: clean offcuts, pallets and old joists, kept free from painted or preservative-treated pieces where possible.
- Metals: copper pipe, lead flashing, steel offcuts and old radiators. These are almost always worth money rather than disposal.
- Plasterboard: usually needs separate handling and cannot go into general skips in many areas.
- General and hazardous: packaging, plastics, and anything like asbestos, old paint tins or chemical containers, which require licensed disposal.
Clear labelling matters more than expensive containers. A cardboard sign reading "TIMBER ONLY" taped to a bay works perfectly well and stops a well-meaning labourer from contaminating a load.
Choose materials and methods that waste less
Some design and specification choices simply generate less offcut by their nature. Where you have flexibility, these are worth discussing with your designer early on.
- Set out rooms and extensions to standard sheet sizes such as 2400 x 1200mm plasterboard, so fewer panels need cutting.
- Consider off-site or modular elements for extensions and roof structures where site constraints allow, as factory cutting is far more efficient.
- Favour drylining systems and modern methods of construction that produce less wet trade waste.
- Specify reclaimed or second-hand sanitaryware, doors and radiators where the style suits, especially for period properties.
- Buy loose aggregates and cement rather than bagged where volumes justify it, cutting plastic packaging dramatically.
Plan for the end of the job
Waste management does not finish when the last trade leaves. Budget an hour or two for a proper sort-out before final clean, and you will often find enough leftover materials to return, sell or keep.
- Take unopened materials back to the merchant within the returns window.
- Advertise surplus bricks, tiles and timber locally; there is almost always a buyer.
- Keep a labelled box of useful offcuts for future repairs in the same house.
- Ask your builder for a waste transfer note or receipt for anything taken away, so you know it was disposed of legally and responsibly.
None of this needs to be complicated. A schedule drawn up in advance, a few labelled bays, and a willingness to salvage rather than scrap will typically cut waste by a third or more. On a modest renovation, that is easily a few hundred pounds saved, and a far lighter load on the environment around you.
tag: Sustainability
Emily Hartley Author
Compare heat pumps, boilers and underfloor heating to find an efficient, comfortable solution that suits your property, budget and local climate.
YOU MAY ALSO LIKE
Planning
-
ERRIC CATONA
Set a realistic contingency, track variations and agree payment schedules to keep renovation or extension costs under control from start to finish.
May 19, 2016 at 5.12 pm
Reply
ERRIC CATONA
Gather drawings, site plans and design statements before submitting to your local authority to avoid common delays and requests for more information.
May 19, 2016 at 5.12 pm
Reply -
ERRIC CATONA
Compare double and triple glazing, frame materials and solar gain to keep your extension comfortable, bright and cheaper to heat throughout the year.
May 19, 2016 at 5.12 pm
Reply
Extensions
Your email address will not be published.